Free engineering tool

UPS sizing & runtime calculator

Enter your loads to get the right UPS class, an N or N+1 layout and the approximate battery energy for your target runtime.

Instant, in your browserNo sign-upFormulas shown

1Load list

2Design parameters

Modern PFC server PSUs: typically 0.9–0.99
Typically 20–30 %
60–80 % for efficiency and lifetime
Redundancy

Result

Estimate
Recommended UPS class—kVA
—Current load (W)
—Current load (VA)
—Required with margins (kVA)
—Current UPS loading
—Battery energy needed (Wh)
—Battery string
Approx. runtime at other load levels (same battery)
Get UPS quotes for this spec

How this calculation works

Choosing a UPS answers two separate questions: capacity (how much power it delivers continuously) and runtime (how long the battery lasts). The tool computes both with common design formulas.

1. Total load

Each device given in VA is converted to watts with the power factor, and vice versa:

W = VA × PF VA = W ÷ PF P_total = Σ (power × qty)

Prefer measured draw or vendor configurator figures (HPE Power Advisor, Dell EIPT) over PSU nameplate ratings — power supplies are usually much larger than the real load.

2. UPS capacity

P_design = P_total × (1 + growth) kVA_req = max( VA_design , W_design ÷ PF_ups ) ÷ max_loading UPS class = smallest standard size ≥ kVA_req

Standard sizes considered: 1, 1.5, 2, 3, 5, 6, 8, 10, 15, 20, 30, 40, 60, 80, 100 kVA and up. For N+1 two options are shown: two equal units in parallel (1+1) or, above 15 kVA, a modular UPS with 10–50 kVA modules plus one spare module.

3. Battery energy

Wh = P_total × (t_min ÷ 60) ÷ η_inverter × aging η_inverter ≈ 0.94 aging (end-of-life) = 1.25 Ah per string ≈ Wh ÷ V_dc

The 1.25 factor makes sure the battery still delivers the runtime at end of life (≈ 80 % of initial capacity). The DC bus voltage is assumed from typical classes (e.g. 240 V for 6–10 kVA, 384–480 V above) — the exact value depends on the UPS model.

Assumptions & limits

  • VRLA capacity drops at high discharge rates (Peukert effect). For runtimes under 30 minutes, final selection must use the battery maker’s constant-power-per-cell tables; the figure above is an energy estimate.
  • The runtime curve uses a 1.15 exponent relative to the design point — for comparison, not a guarantee.
  • Battery rooms above 25 °C shorten battery life sharply (roughly halved per +10 °C).
  • Motor loads (air conditioners, pumps) should not be on the server-room UPS.
FAQ

Questions about this calculation

What is the difference between kVA and kW?

kW is real power; kVA is apparent power; their ratio is the power factor. A UPS must cover the load in both kW and kVA. Modern online UPSs usually have a unity output power factor (10 kVA = 10 kW); older models are 0.8 or 0.9.

Why not load a UPS to 100 %?

Running near nameplate leaves no headroom for inrush current, future growth or heat. 60–80 % loading keeps efficiency high and extends component and battery life.

What does N+1 mean and when do I need it?

One unit more than required is installed, so a failed or serviced unit does not drop the load. N+1 is the baseline for critical server rooms; higher-tier datacenters use 2N (two fully independent A/B paths).

How much runtime do I need?

With a generator, 5–15 minutes is usually enough to start it and transfer the load. Without one, runtime should cover an orderly shutdown or typical local outages; long runtimes (over an hour) multiply battery cost and space.

From numbers to equipment

Get a quote for equipment that matches this result

Attach the result to your request and receive comparable offers from our partner network and international suppliers.

Request a quote$1 = 272,500 Toman